
A subsidiary of China Telecom – the largest telecommunications operator in China – Dongguan Telecom is developing their Data Center facility.
This project includes a hard-working electrical infrastructure to ensure that the operation maintains peak performance at all times.
Proven within Data Center applications, Socomec’s automatic transfer switches offer the ultimate back-up transfer for an organisation’s critical assets, infrastructure and people - and operate in some of the most demanding environments around the world.
Learn more about this project and the solution provided by downloading the case study.
This project includes a hard-working electrical infrastructure to ensure that the operation maintains peak performance at all times.
Proven within Data Center applications, Socomec’s automatic transfer switches offer the ultimate back-up transfer for an organisation’s critical assets, infrastructure and people - and operate in some of the most demanding environments around the world.
Learn more about this project and the solution provided by downloading the case study.
Transfer between a 2000 kVA transformer and a 2000 kVA genset
SOCOMEC S.A.S.
1, rue de Westhouse - BP 60010 - 67235 BENFELD Cedex - FRANCE
Tél : +33 3 88 57 41 41
1, rue de Westhouse - BP 60010 - 67235 BENFELD Cedex - FRANCE
Tél : +33 3 88 57 41 41

Case Study: power availability in Data Center applications
> Privacy Policy
This information is required for the processing of your request. You have a right of access, modification, correction and deletion of data (Information Technology and Freedom of Information Act, January 6th 1978). To exercise this right, please contact webmaster@socomec.com
This information is required for the processing of your request. You have a right of access, modification, correction and deletion of data (Information Technology and Freedom of Information Act, January 6th 1978). To exercise this right, please contact webmaster@socomec.com